The supply base is where the cargo run is won or lost
An offshore installation only sees the end of a cargo run: a vessel arrives and the deck cargo is lifted aboard the platform or rig. Almost everything that decides whether the right items are on that vessel happens earlier, at the supply base, in the days before the vessel loads.
That is why experienced operators plan the run from the base outward. The question is not only what the installation has asked for, but whether each item has arrived at the base, is documented, is identified and is ready to be placed on the deck in the order the vessel will need it.
A useful habit is to walk the run backwards on paper: the installation's need date, the vessel's sailing time, the loading window at the quay and the date each item must reach the base. The earliest of those dates is the real deadline for the supplier or the workshop, and it should be given to them in plain terms.
Start with a clean requisition
Every run begins with a request from offshore. A requisition that names the item, the quantity, the destination installation and the date needed is far easier to act on than a general message asking for spares. Where an item is heavy, long or hazardous, the requisition should say so at the start, because that changes the equipment and the deck space it needs.
Agree one route for requisitions and one person at the base who reads them. When requests arrive from several people by several channels, items are missed or duplicated, and the base learns what is needed only when the vessel is already alongside.
Documents and dimensions before the cargo arrives
Cargo that reaches the base without its paperwork is cargo that waits. Each consignment needs a clear description, weight, dimensions, a packing list and, where it applies, dangerous goods information and any certificates for lifting equipment. Imported items also need their customs position settled before they can be released to the base.
Send dimensions and weights as early as possible. The vessel's deck plan is built from them, and an item whose size is guessed at the last minute can force a re-plan of the whole load. Tubulars, skips, baskets and tanks should be identified and counted so that what is loaded matches what is on the manifest.
- description, weight and dimensions of every item
- packing list and consignment reference
- dangerous goods details where relevant
- certificates for lifting equipment and containers
- customs status of imported items
- destination installation and required date
Consolidate by destination and plan the loading order
Once cargo is at the base, group it by the installation it is going to and by the order in which the vessel will discharge. Items for the first stop should be reachable first. A vessel that loads in the wrong order spends time re-handling cargo offshore, which is expensive time in any rotation.
Share the proposed loading plan with the vessel before loading begins. The master and the deck team can see weight distribution, deck strength and hazardous cargo segregation questions that the shore team may not, and a short conversation before loading is easier than a change halfway through.
Leave room for the late request. Most runs pick up something at the last moment, so a plan that is full to the last square metre has no way to absorb it.
Plan the backload before the vessel sails
A run is not finished when the cargo is delivered. Empty baskets, returned equipment, waste and items for repair come back from the installation, and if nobody has planned for them they accumulate offshore and crowd the deck. Ask for a backload list at the same time as the outbound requisition.
At the base, decide where returned items go, who inspects them and which are waste. A backload received without a destination ties up the quay and the people working on it, and delays the vessel's next loading.
Planning your next cargo run with Vandyvah
Vandyvah's operations team supports offshore operators with the shore-side coordination around a supply base run: cargo movements to the quay, documents, stores, crew logistics and communication with the base and the vessel, with progress updates against the agreed sequence.
The best time to bring us in is while the requisitions are still being written. Contact the operations team before the vessel is due to load and we will work through the cargo list, the documents and the loading sequence with you.
Supply base cargo run: before loading
- requisitions confirmed with item, quantity, destination and date
- weights and dimensions sent for every item
- packing lists and consignment references matched to the cargo
- dangerous goods information and lifting certificates ready
- customs position of imported items settled
- cargo grouped by installation and discharge order
- loading plan shared with the vessel
- backload list requested from the installation
Where delay usually develops
- cargo reaching the base without complete documents
- weights or dimensions given late or estimated
- requisitions arriving from several channels
- cargo loaded in the wrong order for discharge
- late items with no spare deck space
- backload with no agreed destination at the base
What the principal should prepare
- requisitions with quantity, destination and date
- weights, dimensions and packing lists
- dangerous goods and lifting certificates
- a named contact at the base and offshore
What Vandyvah can coordinate
- cargo movements to the quay for loading
- document checks ahead of the vessel's arrival
- stores and provisions supply
- crew and personnel logistics around the run
- communication with the base, terminal and vessel
- progress updates against the agreed loading sequence